Werner         
My first load which origanated in Valdosta Ga. is completed and being unloaded at Georgia Pacific in Dubuque Ia. It was made up of 8 rolls of paper which maxed me out at 80,000 pounds. This was a load that could have been hualed via the railroad. I made the trip with in 48 hours and still like RRs have to run on hours of service. It would take a 50' RBOX car a week to make the same trip. This facility is also served by the ICE.
Date: 12/15/2007 Location: Dubuque, IA   Map Show Dubuque on a rail map Views: 229 Collection Of:   David Stewart
Author:  David Stewart
Werner
Picture Categories: This picture is part of album:  Trucks vs Trains
Share
User Comments
Name Type Comments Date
Sean Kolker General I have had Z trains with Werner trailers on them. Sitting on the extra boards and getting paid to sit at home is probably like watching the yellow/white lines roll by on the roads. I have several family OTR drivers that envy what I make. Railroading and Trucking-great jobs! 2/18/2008 3:20:48 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1014966