Day 3 of bridge replacement work, old bridge was superelevated, new bridge is level with super attained through the ballast         
Date: 12/16/2009 Location: Glouster, OH   Map Show Glouster on a rail map Views: 94 Collection Of:   Jim Trivett
Author:  Jim Trivett
Day 3 of bridge replacement work, old bridge was superelevated, new bridge is level with super attained through the ballast
Picture Categories: This picture is part of album:  NS WV secondary
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1879887