Left side view with a Fraser load in the New England Central Railroad yard at Willimantic, CT. Built 9/1987 by Thrall job 456. Length 79' 8". |
Date:
4/23/2010 |
Location:
Willimantic, CT Map  |
Views:
86 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
a~.jpg) |
Picture Categories: RollingStock,Bridge,Yard |
This picture is part of album: MMA equipment in CT |