The gates were malfunctioning as the train passed through the grade crossing. The conductor did stop and flag the crossing as the MA1 returned to South Plainfield Yard. |
Date:
6/23/2005 |
Location:
South Plainfield, NJ |
Views:
492 |
Collection Of:
Stephen Bradley |
|
Author: Stephen Bradley
|
|
Picture Categories: |
This picture is part of album: Shared Assets Lehigh Line II |