Left side view with a covered contaminated material load exiting the north (left) side of the Railroad Ave 2-track grade crossing in the Providence & Worcester Railroad yard at Plainfield, CT. Built 8/1976. HazMat placard is 3077. 2244 cu ft cap. Length 57' 1". |
Date:
5/30/2018 |
Location:
Plainfield, CT Map  |
Views:
45 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
a.jpg) |
Picture Categories: RollingStock,Yard,Signal,Track,Action |
This picture is part of album: CO equipment in CT |