Westbound Track 2, signal Aspect; Steady Yellow/Amber over Steady Red. Name APPROACH, Indication Proceed prepared to stop at the next signal . Trains exceeding Medium Speed must begin reduction to Medium Speed as soon as the engine passes the Approach Signal. NORAC Rule 285. To the left of track 2 is the signal for the Port Reading Secondary where it connect to the Lehigh Line. To the right is track 1 westbound and its signal is displaying Red/Red Stop. Part of the Valley Interchange Track is visible behind Track 1. 70-300mm zoom lens used. |
Date:
8/17/2022 |
Location:
Bound Brook, NJ |
Views:
99 |
Collection Of:
Steve Coraggio |
|
Author: Steve Coraggio
|
|
Picture Categories: Scenic,Bridge,Signal,Track,Action |
This picture is part of album: MA-2 Westbound Track 2, with Approach then Stop and Proceed Signals then Continues West |